İçeriğe geç

PlannedThis capability is planned and not available yet. Examples are fictional; available today are pivot evaluations, CSV export and sharing.

Smart alerts · Planned

One threshold, one alert,
one task you approve.

Alerts are planned for when a saved evaluation crosses a threshold you set. The alert is meant to state value, threshold and data basis and to propose a task that is only created after you approve it. It does not exist yet. Today you turn a finding into a task in Peak Task yourself with “Check”.

Planned, not available. No automatic alert, no automatically created task. In the preview: “Check” by hand, with a link back to the evaluation.

QUESTION BEFORE EVALUATION

Your question.
A draft you can check.

01 / Your question

56/600 · fixed templates, no model call

Peak Analytics / Smart alertsFICTIONAL
02 / The visible evaluation draft3 sample questions

Lindgrün Agency (fictional)

Beyond a certain amount of open work, a client needs a conversation, not another week of waiting.

  1. 01Tasks by board, status open
  2. 02Threshold: more than 15 (planned)
  3. 03Alert → task after approval
Check all steps & assumptions

How it is planned

Threshold, alert, approval.

An alert is meant to end in a task, not in an inbox.

01 / The starting point

Set a threshold

Tell me when a client board has more than 15 open tasks.
Your questionLindgrün Agency (fictional)

Planned: you pick a saved evaluation and a threshold, such as more than 15 open tasks per board or refunds above last month.

02 / Visible draft

An alert with a reason

Your question / Evaluation draftFICTIONAL EXAMPLE
  1. 01
    Step of the evaluation

    Tasks by board, status open

  2. 02
    Step of the evaluation

    Threshold: more than 15 (planned)

  3. 03
    Step of the evaluation

    Alert → task after approval

03 / Your decision

A task after approval

Planned: the alert proposes a task; it is only created once you agree. The last step already exists: “Check” creates a task in Peak Task.

Local review

Your review is still open.

These marks start nothing.

Draft and evaluation stay separate

What this page promises and what it does not.

01 / Here in the browser

Planned, not available

This capability is specified and not built yet. There is no date and no separate price.

Your questionFixed ruleSample evaluation
The sculpture illustrates the flow. It is not a product interface.
02 / In the planned product

Fictional examples

Businesses and numbers on this page are made up and marked as examples. None of it is a measurement or a customer result.

Evaluation
Planned, not built yet
Permissions
Your workspace roles
03 / The limit

What works today

Peak Analytics is available as a preview: pivot evaluations over orders, receipts, tasks, goals and files, CSV export and sharing.

DraftReal evaluation

Your next step

Until then: check by hand.

See how a finding becomes a task that links back in the preview. Smart alerts are meant to take exactly this path.

Today: turn a finding into a task
Smart alerts · PlannedTell me when a client board has more than 15 open tasks.

Planned, not available. No automatic alert, no automatically created task. In the preview: “Check” by hand, with a link back to the evaluation.

Frequently asked questions

Can I use this in Peak Analytics yet?

No. This capability is planned and not built yet; there is no launch date. Available today is the Peak Analytics preview: pivot evaluations over orders, receipts, tasks, goals and files with CSV export and sharing.

Do alerts create tasks automatically?

No. The plan is that an alert proposes a task and it is only created after your approval.

Who sets the thresholds?

You do, on a saved evaluation with a visible definition, such as more than 15 open tasks per board.

What do I use until then?

“Check” in the preview: a finding from the pivot becomes a task in Peak Task with a link back to the evaluation.