Gantt and Kanban answer different questions. The tasks behind them are the same.

A Gantt chart asks „When, and what depends on what?“. A Kanban board asks „Where is the work right now?“. In the demo you see one project in both views.

الحالة: Available in Peak One

Step by step

  1. Gantt: time and dependencies

    Tasks as bars on a timeline, linked by dependencies. Strong for fixed dates, phases and chains of tasks.

  2. Kanban: flow and status

    Tasks as cards in columns such as open, in progress, review, done. Strong for ongoing work, priorities and bottlenecks.

  3. When Gantt helps

    Launches, relaunches, events, anything with a fixed end date and tasks that wait on each other.

  4. When Kanban helps

    Ongoing production, support, content, anything with a steady inflow and shifting priorities.

  5. WIP limits in Kanban

    A cap on cards in a column. Once reached, you finish work before starting something new.

  6. Both at once

    Many projects need both: the plan for dates and the board for the day to day. What matters is that both show the same tasks.

Try it

One project, four views

Sample data · nothing is saved

Planned

In progress

Review

Done

Click a task to move its status, then switch views: it is the same task everywhere. Board, list and calendar are available in Peak One, the timeline is beta.

Interactive demo with invented sample data. No account, nothing is saved or sent.

Honest limits

  • The timeline is beta

    Board and list are available in Peak One. The timeline (Gantt) exists in Board V2, part of Work V2, not yet in the app catalog.

  • The demo shows sample data

    The views in the demo run on an invented project in your browser and save nothing.

Frequently asked questions

Is Kanban agile and Gantt classic?

Roughly, but the view is not the method. Agile teams need dates too, and classic teams benefit from a board.

Do I have to pick one view?

No. In Peak One a task is one row that board, list, timeline and calendar show. You change the view, not the data.

What is a WIP limit?

A work in progress limit: the most tasks allowed in a column at the same time. It makes bottlenecks visible.

One truth, two angles.

The plan for when, the board for now. Try both in the demo.