Přejít na obsah

Peak Docs · Integrations

Connections
with a real status.

Documents refer to customers, projects and tasks in Peak One and create tasks. Import and export are partly there. Connections to outside tools are not available yet.

Start Peak Docs

Example mapping · status per connection · no connection is made

Peak DocsThe checklist item
TaskThe task
Task · Example mapping
One mapping in detail
01 / Peak DocsChecklist item
02 / Fictional test valueApprove the brief (example)
03 / Tasktask.title

A readable path as an example. No transfer.

View all 5 mappings
Example mapping with fictional values.
Peak DocsTask element
Checklist itemtask.title
Relationconcerns
Ownertask.assignee
Duetask.due_date
Sourcetask.source
Example mapping
No transfer
You set this up in the product. Nothing is connected or transferred on this page.
One concrete target

Understand structure. Keep the source.

TaskArrival in the workspaceNot checked yet

The mapping shows the translation. Only a test in your workspace shows what actually arrives.

02 / Status before logo

Every connection with its state.

Available, partial or not available: this is where things stand today.

  1. 01 / Available

    Available: Peak One

    References to customers, projects and tasks with backlinks; comment and checklist → task; Inbox notices.

    What works today?Peak One referencesTasksInbox
  2. 02 / Partial

    Partial: files

    Import from Markdown and text only; export as PDF, Markdown or HTML, no DOCX.

    What works with limits?Import: Markdown, textExport: PDF, MD, HTMLNo DOCX
  3. 03 / Not available

    Not available: outside tools

    Direct connections to tools outside Peak One do not exist for Peak Docs yet.

    What is still missing?Outside toolsGuest accessSending

Trust needs clarity

Status, requirements and limits.

01 / The existing evidence

A mapping is not a delivery receipt

The example shows the translation. No data is transferred here.

Peak Docs / TaskEXAMPLE
Peak DocsMappingTask
Mapping
Example
Arrival in the workspace
Not checked

02 / Your check

Sharing by link

A public read-only page exists only when you release a version on purpose through a share link.

Account
Not connected
Permission
Grant in the product

03 / The clear limit

No blanket “integrated”

Peak One references, file formats and missing outside connections are named one by one.

  • Available
  • Partial
  • Not available
  • Planned

The next step

Know the status first. Then connect.

Start Peak Docs and link your first document to a project or a task.

Start Peak Docs
Your mappingNOT CONNECTED
Peak Docs→Task
Checklist item → task.title

Check in your workspace what actually arrived.

Frequently asked questions

Which Peak apps is Peak Docs connected to?

Documents refer to customers, projects and tasks in Peak One, create tasks from comments and checklists and notify through the Inbox.

Are there connections to outside tools?

Not yet. Direct connections outside Peak One are not available for Peak Docs.

How do I share a document outside?

Through a share link with a public read-only page, for which you release a version on purpose.