跳到内容
Peak Funnel

Peak Funnel

Funnel structure

确定入口和目标,把从第一个页面到询价再到下一步的环节连接起来。然后对照实际数据与计划。

Funnel structure

How to set up your funnel

Set the entry point and goal and connect the stages from the first page through the inquiry to the next step. That turns individual links into a traceable process.

  1. Set entry point and goal

    Set where prospects enter and what should happen at the end, for example an inquiry or an appointment.

  2. Connect stages

    Connect the stages of your campaign from the first page through the inquiry to the next step.

  3. Include existing pages

    Pages from Pages can be linked into funnels. You'll see how to select them in the funnel in the app.

FunnelNo signup needed
Interactive demo

TRY IT. MAKE IT YOURS. TAKE IT WITH YOU.

Connect three stages into one clear journey.

01

Make it yours.

Your edits stay in this tab until transfer. Reloading clears them.

02

Your planned journey

WORKFLOW PREVIEW

From interest to conversation

01
EntryOffer page
02
Desired actionComplete project inquiry
03
Next stepArrange an introductory call

Simulation. No integrations connected and no actions executed.

THIS IS YOUR START.

Continue with it in Peak One.

Your edited details are transferred to a new Peak One tab. Sign in there, review your draft and confirm the next step.

Sign in when you continue in Peak One.
  • 无需账号即可试用
  • 你自己的草稿
  • 由你决定上线什么

Peak Funnel

把你下一场营销活动的路径建成一个漏斗。

试用你的使用场景,然后在 Peak One 中继续完善你的草稿。

返回预览
示意示例

Funnel · Müller GmbH 春季活动

试用