Draft · not indexed。 Part of what this page describes is not generally available yet.
Peak One · Beta
Five projects are running. One needs your attention today.
Mission Control shows every project with its health and the reason behind it. It is in beta and builds on the Work V2 portfolio and Peak Command.
All projects · exceptions first
Sample data · nothing is saved2 Critical1 Attention2 On track
- Critical
- Critical
- Attention
- On track
- On track
Rule: critical when something is blocked and the milestone is 4 days away or less, or 3+ tasks are overdue. No overall score.
Interactive demo with invented sample data. No account, nothing is saved or sent.
How it works
Health with a reason
Each project is on track, needs attention or is critical. Next to it you see why, for example overdue or blocked tasks.
Derived, not guessed
Health is calculated from the tasks. Nobody has to maintain a traffic light by hand.
Problems first
What needs attention goes on top. Projects on track stay quietly in the background.
Filter instead of search
Filter by health, client or owner and see only what concerns you right now.
All pages in this area
Honest limits
In beta
Mission Control uses the Work V2 portfolio, which is not in the app catalog yet. The view and rules may change.
No overall score
There is no health number for the whole company. Every status names its rule.
Frequently asked questions
Where does a project’s health come from?
It is derived from the tasks, such as overdue or blocked ones. The reason is always shown.
Can I use Mission Control today?
It is in beta and not switched on for everyone yet. The demo on this page shows the idea with sample data.
Does it replace reporting?
It shows the current state. AI status reports are planned but not available yet.
