Chuyển đến nội dung
Peak Funnel

Peak Funnel

Funnel structure

Xác định điểm vào và mục tiêu, rồi nối các trạm từ trang đầu tiên qua yêu cầu đến bước tiếp theo. Sau đó bạn so sánh số liệu thực tế với kế hoạch.

Funnel structure

How to set up your funnel

Set the entry point and goal and connect the stages from the first page through the inquiry to the next step. That turns individual links into a traceable process.

  1. Set entry point and goal

    Set where prospects enter and what should happen at the end, for example an inquiry or an appointment.

  2. Connect stages

    Connect the stages of your campaign from the first page through the inquiry to the next step.

  3. Include existing pages

    Pages from Pages can be linked into funnels. You'll see how to select them in the funnel in the app.

FunnelNo signup needed
Interactive demo

TRY IT. MAKE IT YOURS. TAKE IT WITH YOU.

Connect three stages into one clear journey.

01

Make it yours.

Your edits stay in this tab until transfer. Reloading clears them.

02

Your planned journey

WORKFLOW PREVIEW

From interest to conversation

01
EntryOffer page
02
Desired actionComplete project inquiry
03
Next stepArrange an introductory call

Simulation. No integrations connected and no actions executed.

THIS IS YOUR START.

Continue with it in Peak One.

Your edited details are transferred to a new Peak One tab. Sign in there, review your draft and confirm the next step.

Sign in when you continue in Peak One.
  • Dùng thử không cần tài khoản
  • Bản nháp của riêng bạn
  • Bạn quyết định nội dung nào được đăng

Peak Funnel

Tạo hành trình của chiến dịch tiếp theo thành một funnel.

Hãy thử nhu cầu của bạn. Sau đó tiếp tục hoàn thiện bản nháp trong Peak One.

Quay lại bản xem trước
Ví dụ minh họa

Funnel · Chiến dịch mùa xuân Müller GmbH

Dùng thử