Skip to content
Peak Atlas

Planned This capability is specified but not built yet. The page shows the plan with fictional examples. Available today: Today brief, Top 3, decisions with memory, goals, roadmap and scenarios.

Peak Command · Prepared actions · planned

Prepared by Command.
Carried out only after your approval.

Planned: for a decision, Command is meant to prepare the follow-up steps, such as tasks in Peak Work or a change in Peak Year, and carry them out in the owning product only after your approval. Steps with an external effect are meant to need an approval of their own. Today Command writes decisions, initiatives and tasks one at a time through the owning product.

Planned feature · fixed examples · nothing is carried out

CONTEXT BEFORE DECISION

Your question.
A path you can follow.

01 / Your question

59/600 · fixed examples, no model call

Peak Command / Your pathEXAMPLE
02 / The visible path3 example steps

New role

Why: A hire affects plan, capacity and budget. The steps are meant to be prepared together so none is forgotten.

  1. 01Planned: record the decision with its reason in Peak Log
  2. 02Planned: task “Write the role profile” in Peak Work, owner: you
  3. 03Planned: note capacity from January in Peak Plan as an assumption
Check all steps & reasons

02 / How it is meant to work

Prepare. Check. Approve.

A decision often brings several steps with it. They are meant to be prepared together and traceable one by one.

01 / The starting point

Prepare steps

We have decided to hire a second project lead from January.
Your questionNew role

Planned: the decision turns into a list of steps, each with its product, content and reason.

02 / Visible path

Check one by one

Your question / Path to the situationLOCAL EXAMPLE
  1. 01
    Example step

    Planned: record the decision with its reason in Peak Log

  2. 02
    Example step

    Planned: task “Write the role profile” in Peak Work, owner: you

  3. 03
    Example step

    Planned: note capacity from January in Peak Plan as an assumption

03 / Your decision

Approve and keep a record

Planned: only after your approval does the owning product carry out the steps; each is visible in the history afterwards.

Local review

Your review is still open.

These marks decide nothing.

Situation and decision stay separate

Planned means: not here yet.

01 / Here in the browser

Preparing actions is planned

Follow-up steps prepared as a bundle are planned. Nothing is ever carried out without approval, and steps with an external effect are meant to need an additional approval.

Your questionFixed ruleExample steps
The sculpture illustrates the flow. It is not a product interface.
02 / Planned in Command

Usable in Command today

Today Command writes a decision to Peak Log, an initiative to Peak Year and a task to Peak Work, each triggered by you.

Status
Planned, not available yet
Today
Brief, top 3 and decisions usable
03 / The limit

No date promised

We do not say here when the feature arrives. We name it once it is provably available.

ProposalExecution

The next step

Today: prepare decisions well.

See how Command already keeps candidates with reasons, scenarios and decision reviews together today.

View decision preparation
Peak Command · Prepared actions · plannedWhat has been decided?

Planned feature · fixed examples · nothing is carried out

Frequently asked questions

Can I use prepared actions yet?

No. It is planned and no date is promised. Today Peak Command shows the daily brief, top 3, decisions, goals, initiatives and scenarios from the Peak products.

Will Peak Command run actions on its own?

No. Planned or not: Command prepares, you check and approve. Risky steps are meant to need explicit approval.

What works today?

Today you record decisions in Command and create tasks in Peak Work, both yourself and with your confirmation.

Does Peak Command store data of its own?

No. Peak Command owns no data. It reads the Peak products with your permissions and writes only through the owning product, such as decisions in Peak Log.