The plan is right.Until two people are missing.

Peak Command reads blockers and tasks from Peak Work, capacity from Peak Plan and milestones from Peak Year. You see where an initiative is stuck and run a delay as a scenario without changing the plan.

Put the goal into words. Add perspectives and timing right below.

Local draft · no product activation
Open the interactive demo

Example: Bergwerk Manufaktur (fictional), production and shipping.

Plan, forecast, reality.

Blocker / Capacity / Milestone

01Plan02Forecast03Reality
Example / Roadmap at Bergwerk

Where plan and reality drift apart.

Plan
Reusable packaging · milestone 15 March
Forecast
29 March · two blockers in Peak Work
Reality
Shipping planned at 120 % (Peak Plan)
Example with fictional data · not the product interface

Your bottleneck in the example

Initiative, capacity, consequence.

Describe a stuck initiative and what a delay would mean. Nothing is saved.

Local working example · nothing is saved or sent. Please don't enter personal data.

Peak Command / Start noteLOCAL DRAFT
01 / Your thoughts
02 / Your start noteLocal preview

Three answers. One bottleneck.

Draft · not yet put together

Initiative
Still open
Capacity
Still open
Scenario
Still open
Your input appears here right away. With “View the start note” you check the three details locally.

From blocker to decision

Find, work through, decide.

A scenario changes nothing until you apply it in the owning product. Command calculates, Peak Year and Peak Work remain the truth.

  1. 01Find

    What is stuck, and why?

    Plan

    Reusable packaging · milestone 15 March

    Under “Plan”, the roadmap shows plan · forecast · reality per initiative, with the blockers from Peak Work.

    Peak Year + Peak Work → roadmap
  2. 02Work through

    A delay as a scenario.

    Forecast

    29 March · two blockers in Peak Work

    “What if the initiative slips by two weeks?” Command calculates with Peak Year and Peak Finance and changes nothing.

    Scenario → consequences, no change
  3. 03Decide

    Postpone, reinforce or drop.

    Reality

    Shipping planned at 120 % (Peak Plan)

    The decision lands in Peak Log, you make the change in Peak Year. In the example a local note is created.

    Sample artifact → bottleneck note

What works in Peak Command today

Check your roadmap against reality.

Peak Command shows roadmap, blockers and capacity from your Peak apps and calculates scenarios such as a delay or skipping an initiative.

Sign in to Peak Command

Peak Command / Your next step

Calculate first, replan second.

Pick the initiative furthest behind its plan.

Open the interactive demo
Local working example

For COOs who keep operations running.

Shipping planned at 120 % (Peak Plan)